TC_030_CS — Unlock Connector – Unlock Failure
TC_030_CS — Unlock Connector – Unlock Failure
Source: OCPP 1.6 — Compliancy Testing Tool — Test Case Document (Trial 2025-06, Draft). System Under Test: Charge Point, page 41.
Identification
| Field | Value |
|---|---|
| Test case name | Unlock Connector – Unlock Failure |
| Test case Id | TC_030_CS |
| System under test | Charge Point |
Description
This scenario is used to report a connector lock failure.
Purpose
To test if the Charge Point is able to report a connector lock failure.
Prerequisite(s)
Ensure the Charge Point is in a state where a connector lock failure can be triggered.
Before (Preparations)
Configuration State(s):
- N/a
Memory State(s):
- N/a
Reusable State(s):
- N/a
Scenario Detail(s)
| Charge Point (SUT) | Central System (Tool) |
|---|---|
| 2. The Charge Point responds with a UnlockConnector.conf | 1. The Central System sends a UnlockConnector.req |
Tool validation(s)
Charge Point side:
Step 2:
(Message: UnlockConnector.conf) status is UnlockFailed
Central System side:
- N/a
Expected result(s) / behaviour
Charge Point side:
- N/a
Central System side:
- N/a