Skip to content
Documentation Menu

TC_030_CS — Unlock Connector – Unlock Failure

TC_030_CS — Unlock Connector – Unlock Failure

Source: OCPP 1.6 — Compliancy Testing Tool — Test Case Document (Trial 2025-06, Draft). System Under Test: Charge Point, page 41.

Identification

FieldValue
Test case nameUnlock Connector – Unlock Failure
Test case IdTC_030_CS
System under testCharge Point

Description

This scenario is used to report a connector lock failure.

Purpose

To test if the Charge Point is able to report a connector lock failure.

Prerequisite(s)

Ensure the Charge Point is in a state where a connector lock failure can be triggered.

Before (Preparations)

Configuration State(s):

  • N/a

Memory State(s):

  • N/a

Reusable State(s):

  • N/a

Scenario Detail(s)

Charge Point (SUT)Central System (Tool)
2. The Charge Point responds with a UnlockConnector.conf1. The Central System sends a UnlockConnector.req

Tool validation(s)

Charge Point side:

Step 2:

(Message: UnlockConnector.conf) status is UnlockFailed

Central System side:

  • N/a

Expected result(s) / behaviour

Charge Point side:

  • N/a

Central System side:

  • N/a