Skip to content
Documentation Menu

TC_082_CS —

TC_082_CS —

Source: OCPP 1.6 — Compliancy Testing Tool — Test Case Document (Trial 2025-06, Draft). System Under Test: Charge Point, page 85.

Identification

FieldValue
Test case name
Test case IdTC_082_CS
System under testCharge Point

Description

The Central System sets a default schedule for a currently ongoing transaction.

Purpose

To check whether the Charge Point is able to handle a default schedule for a currently ongoing transaction.

Prerequisite(s)

The Charge Point supports the Smart Charging feature profile.

Before (Preparations)

Configuration State(s):

  • N/a

Memory State(s):

  • N/a

Reusable State(s):

  • Charging

Scenario Detail(s)

  • N/a

Tool validation(s)

Charge Point side:

  • N/a

Central System side:

  • N/a

Expected result(s) / behaviour

Charge Point side:

  • N/a

Central System side:

  • N/a