Skip to content
Documentation Menu

TC_E_14_CSMS — Stop transaction options - EVDisconnected - Charging Station side

TC_E_14_CSMS — Stop transaction options - EVDisconnected - Charging Station side

Source: OCPP 2.0.1 Part 6 — Test Cases (Core & Advanced Security, FINAL, 2023-06-30) — Functional block E. Transactions, page 383.

Identification

FieldValue
Test case nameStop transaction options - EVDisconnected - Charging Station side
Test case IdTC_E_14_CSMS
Use case Id(s)E06(S2)
Requirement(s)E06.FR.02
System under testCSMS
Functional blockE. Transactions

Description

OCPP 2.x.x has a flexible transaction mechanism that allows the transaction start and stop points to be configured differently. This test covers one of the stop options.

Purpose

To verify if the CSMS is able to handle a Charging Station that stops a transaction when the EV and EVSE are disconnected at the Charging Station side.

Prerequisite(s)

N/a

Before (Preparations)

Configuration State:

  • N/a

Memory State:

  • N/a

Reusable State(s):

  • State is EVConnectedPostSession

Main (Test scenario)

Charging StationCSMS
1. Execute Reusable State EVDisconnected

Tool validations

N/a

Post scenario validations

  • N/a