Skip to content
Documentation Menu

TC_G_12_CS — Change Availability Charging Station - Operative to operative

TC_G_12_CS — Change Availability Charging Station - Operative to operative

Source: OCPP 2.0.1 Part 6 — Test Cases (Core & Advanced Security, FINAL, 2023-06-30) — Functional block G. Availability, page 208.

Identification

FieldValue
Test case nameChange Availability Charging Station - Operative to operative
Test case IdTC_G_12_CS
Use case Id(s)G04
Requirement(s)G04.FR.01, G04.FR.02, G04.FR.03, G04.FR.04, G04.FR.05
System under testCharging Station
Functional blockG. Availability

Description

This test case describes how the CSMS requests the Charging Station to change the availability from inoperative to operative. A Charging Station is considered Operative when it is charging or ready for charging. A Charging Station is considered Inoperative when it does not allow any charging.

Purpose

To verify if the Charging Station is able to perform the change availability from operative to operative according to the mechanism as described at the OCPP specification.

Prerequisite(s)

n/a

Before (Preparations)

Configuration State:

  • N/a

Memory State:

  • N/a

Reusable State(s):

  • N/a

Main (Test scenario)

Charging StationCSMS
2. The Charging Station responds with a ChangeAvailabilityResponse1. The OCTT sends a ChangeAvailabilityRequest; with operationalStatus Operative

Tool validations

Step 2:

Message ChangeAvailabilityResponse

  • status Accepted

Post scenario validations

  • A message to report the state of a connector has been received for all connectors.