Skip to content
Documentation Menu

TC_G_15_CS — Change Availability Connector - Operative to operative

TC_G_15_CS — Change Availability Connector - Operative to operative

Source: OCPP 2.0.1 Part 6 — Test Cases (Core & Advanced Security, FINAL, 2023-06-30) — Functional block G. Availability, page 212.

Identification

FieldValue
Test case nameChange Availability Connector - Operative to operative
Test case IdTC_G_15_CS
Use case Id(s)G03
Requirement(s)G03.FR.01, G03.FR.02, G03.FR.03, G03.FR.04
System under testCharging Station
Functional blockG. Availability

Description

This test case covers how the CSMS requests the Charging Station to change the availability of one of the EVSEs from Operative to Inoperative. An EVSE is considered Operative in any status other than Faulted and Unavailable.

Purpose

To verify if the Charging Station is able to perform the change availability from Operative to Operative of one connector according to the mechanism as described at the OCPP specification.

Prerequisite(s)

n/a

Before (Preparations)

Configuration State:

  • N/a

Memory State:

  • N/a

Reusable State(s):

  • N/a

Main (Test scenario)

Charging StationCSMS
2. The Charging Station responds with a ChangeAvailabilityResponse1. The OCTT sends a ChangeAvailabilityRequest; with operationalStatus Operative and evse.id <Configured evseId> and evse.connectorId <Configured connectorId>

Tool validations

Step 2:

Message ChangeAvailabilityResponse

  • status Accepted

Post scenario validations

  • A message to report the state of a connector has been received for all connectors.